Premier Mounts GB-AVSTOR5 Specifications Page 9

  • Download
  • Add to my manuals
  • Print
  • Page
    / 15
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 8
Installation Instructions Visit the Premier Mounts website at www.mounts.com Page 9
GB-AVSTOR5
W
Ceiling
Framework
QuickLock
Adjustthe
1
/16˝braidedcablesothatthecableformsa
15°angleawayfromthecorneroftheceilingbox.
Whenadjustingthetensionoftheweight-bearing
sideoftheQuickLock,the
1
/16˝braidedcable must
bepulledthroughtheQuickLockuntilthedesired
tensionisattained.Donotovertighten.
Whenyouhavethedesiredtension,pullthe
1
/16˝
braidedcablethroughtheothersideoftheQuick
Lock.
Oncethetensionhasbeenadjusted,besurethat
thereisaminimumof6”ofexcess
1
/16˝braidedcable
onthenon-weightbearingsideoftheQuickLock.
Usecablecutterstoremoveanyremaining
1
/16˝
braidedcable(optional).
Go to Wiring the Electrical Boxonpage10.
6” Excess
1
/16˝BraidedCable
1
/16˝Braided
Cable To Ceiling
Attachment
Step 2
Itisrecommendedthatthefollowingstepsbe
performedbytwopeople.
Lowertheceilingboxintotheexposedceiling
framework.
Makesuretheceilingboxisseatedcompletelyin
theceilingframeworkbeforereleasingit.
15°
Page view 8
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Comments to this Manuals

No comments