Page 8 Visit the Premier Mounts website at http://www.mounts.com Installation Instructions
PP-FCTA
Once the ceiling plate assembly is resting on the t-bar
frame rails, use a screwdriver to tighten the four (4)
M5 x 16mm combo screws.
®
Slide and center the upper plate assembly over the
hole that was cut in the tile.
¯
Tighten all four (4) wing nuts.
Cut the tile where the electrical box is going to be
secured.
®
Using (commercially available) hardware depending
on electrical installation environment, install the
electrical box and secure it to the ceiling plate
assembly.
¯
Make all electrical connections at this time.
Securing the Ceiling Plate
Do not overtighten the mounting screws.
M5 x 16mm Combo Screw
Tiles
T-Bar Frame Rails
Electrical Box Cut-out Removal
Electrical installation should be completed by a certied
electrician.
Proceed to the ″Electrical Box Cut-out Removal″ section
below.
Upper Adapter Plate
Upper Plate Assembly
Electrical Box
Cut-out
Electrical Box
(Commercially
Available)
Proceed to the ″Attaching the Turnbuckles″ section.
PP-FCTA